Introduction
Input > Process > Output
| Input | Process | Output |
|---|---|---|
| – Life cycle concepts – System requirements – Verification criteria – Updated RVTM – Interface definition – Integrated system or system elements – Integration report | > Prepare for verification > Perform verification > Manage results of verification | = Verification strategy = Verification enabling system requirements = Verification constraints = Verification procedure = Final RVTM = Verified system = Verification record |
8.Integration process > 9. Verification process > 10. Transition process

